28 Jun 2007

It's hard to see the truth through all the smoke

Another great column by John Barber at the Globe and Mail. If only our Regional Councillors could see it so clearly...

The Globe and Mail
Sat 23 Jun 2007
JOHN BARBER

There's nothing like a good, clean hit to enliven either a hockey game or a public debate, and Peterborough consultant Clarissa Morawski landed a beauty this spring when she looked at the emissions data for the necklace of large garbage incinerators our suburban neighbours plan to build around Toronto.

The data, supplied by the vendors of incinerators and published as an appendix to the environmental assessment of the plant that Hamilton and Niagara Region hope to build, showed an entirely different picture from the rosy propaganda the vendors and their agents had spun about their wondrous technology.

Unlike the old incinerators that were once considered safe - until they weren't - the new ones are said to be advanced "energy-to-waste" facilities that turn household waste into clean energy. But the data submitted by the vendors themselves showed that this new technology was one of the dirtiest imaginable ways to produce power - far worse even than coal-fired power plants in terms of heavy-metal and greenhouse-gas emissions.

"I was absolutely shocked that incineration is still under consideration, given the pollution profile alone," Ms. Morawski said at the time. So were a lot of people when she published her findings in Solid Waste Magazine. In the time since then, concerns about the huge costs and potential hazards of incineration have led Halton Region to cancel plans to build a facility, while Niagara and York are slipping free of the partnerships they once entered to do the same.

But Hamilton and Durham still appear determined to go it alone with their big burners, doubling down on what their counterparts considered a losing bet. They do have one new advantage: The inconvenient facts that helped deter the others no longer exist.

Within weeks of Ms. Morawski's critique, the "comparative emission study" she relied on disappeared from the website documenting the Hamilton-Niagara environmental assessment. Within months of the date one of the facilities is scheduled to be built - thanks to the McGuinty government's recent decision to fast- track incinerator projects - there is no agreed-upon data about what will come out of their stacks.

The reason, according to the consultant who advised that the data be "taken down," is that they were incorrect. "We've found more recent information that corrects it," said David Merriman of Genivar Inc., the firm advising both the Hamilton and the Durham teams on their projects. The Niagara document, which was posted for more than a year, was only a draft, according to Mr. Merriman.

"We found, having posted it, there were some incorrect things," he said. "We removed it and we're now working on a corrected version that we will be presenting in September."

Mr. Merriman wouldn't say when he discovered the data was incorrect, but acknowledged the review was inspired in part by incinerator vendors "who told us the emissions coming out of the new technologies are lower than they have been historically."

So they get to supply new numbers, based on their fondest hopes for the very latest technology, to update the image of facilities that were once considered state-of-the-art, low-emission power plants - until they weren't, sometime last week, at which point they reverted to being dirty old mass-burn incinerators.

Technology advances - and so does the tricky business of calculating greenhouse-gas emissions, which represent another image problem for the nasty old incinerators that were so clean and modern last week. Thus the consultants also plan to introduce new, radically downgraded estimates about their carbon-dioxide emissions to replace the ugly numbers that disappeared.

The change is necessary not because there is new technology that reduces carbon emissions from garbage burners, according to Mr. Merriman, but because there is new thinking about how to count them. The actual emissions will stay the same, but the numbers reported in September will likely be halved.

Incinerator vendors have long supported such an approach, which is used by the Intergovernmental Panel on Climate Change to calculate national carbon inventories - and assumes, among many other things, that all the paper and wood burned as garbage will come from renewable sources. But applying such factors to emissions from actual burners with real smokestacks is highly controversial.

"It's totally inappropriate that anyone would apply IPCC guidelines when measuring emissions from thermal stations," Ms. Morawski said. "We just want to know what comes out of the stack."

But we no longer do - and likely never will, if the new arithmetic prevails and reported carbon emissions fall dramatically this September. In the meantime, numbers swirl headily behind the scenes.

What a spectacle. It's enough to make you realize why the McGuinty government exempted garbage incinerators from the Environmental Assessment Act. Learning the truth about them is such a confusing business.

jbarber@globeandmail.com

21 Jun 2007

Clarington Report Card

"Single issue proving divisive for Clarington Council"

The Metroland Report Card evaluation has been published for our Clarington Council, and while it hits pretty close to the heart of the matter, we might have judged some things slightly differently.

" This year’s grade: C "
" Last year’s grade: B+"

" Clarington council has gone from one extreme to another since its last report card came out one year ago."

"In 2006 we were looking at a slate of seasoned councillors led by a multiple-term mayor who ran the municipality very smoothly but with an iron fist. They had a plan and acted as a cohesive group."

Not sure they were actually so much a cohesive group as a group ruled by a mayor who truly ruled with an iron fist. There was little or no debate about anything. What the mayor said was what was done, period. It appeared that he ruled with TOO MUCH of an iron fist, and that is also not good for the municipality nor for staff or council or residents. Residents were also ruled by an iron fist, many times with intimidation and rudeness. That is not really a good scenario for anyone.

"But the election last year changed the makeup of council and brought new views to the table. Not only do we have three new councillors but also a new mayor in Jim Abernethy."

"While this new crew provides fresh perspective at council meetings they also bring with them a big learning curve. We expected a few hiccups but also for the mayor and each new councillor to do everything they could to learn the job and represent constituents in a fair and reasonable way. So far they’ve done just that."

We agree that the new councillors have done their best to represent their constituents in a fair and reasonable way, but cannot quite say the same for the Mayor with his flip-flops from campaign promises and his unreasonable "landfill or incineration" stance. There are other choices and he won't consider looking at any of them. He also won't accept that incineration does not eliminate landfill, it just puts different materials (ash) into the landfills, including toxic ash that must be shipped to a special facility as it is hazardous waste. We feel the Mayor has not yet realized that he should be representing the PEOPLE, not just the region.

"However, the hiccups that have occurred have been hard to ignore."

"Mayor Abernethy’s absence at the first session of the GTA Mayors and Chairs was unbelievable. Here was a first-time mayor who had zero council experience before being elected. His absence was noticed throughout Durham Region."

It was certainly noticed by residents as well. A very bad start.

"But give the mayor his due, he has settled into the job in recent months and has gained focus. His timing couldn’t have been better because one of the biggest issues ever to hit the municipality has reared its ugly head -- the proposed EFW facility or incinerator as many residents put it."

He certainly has gained focus, but the focus seems to be on incineration and on doing the region's bidding, to the exclusion of most everything else. He appears to have become closed-minded on anything connected to the region, in favour of the region and not of Clarington. While the Statesman gave the Mayor a B-, we would give him a C at best, for now.

"This is one of the issues that requires strong leadership from the mayor because it’s clearly dividing councillors into two camps -- regional versus local."

Strong leadership yes. Tunnel vision, no.

"How else can you explain local councillors Gord Robinson, Willie Woo, Ron Hooper and Adrian Foster’s refusal to allow Regional Chairman Roger Anderson to speak at a recent council meeting regarding EFW?"

The local councillors are listening to the people. The regional councillors (Abernethy, Trim and Novak) are not. They are gung-ho on the region, the region's vision, the region's everything, and are forgetting about what is best for Clarington. The region is NOT always right (remember the greenbelt?).

"They claim it was meant to send a message to Regional council but the message was lost in translation."

We don't think anything was lost in translation. The regional councillors are treating the local councillors like they aren't important, like they shouldn't have any say in things that occur at the regional level, that the regional councillors are above the local councillors in importance, knowledge, and everything that matters. They don't even bother to let the locals know what is going on at the region, and they make motions and resolutions in the name of Clarington without even having them first approved at Clarington Council level. That is just plain WRONG. And we all know that there was no new information for council forthcoming from Chairman Anderson beyond what was already known (the short-list of sites). He was there for one reason only - to send a "message" to the local councillors that they would be allowed $200,000.00 for any peer review studies and no blank cheque. That they would do what the region told them to do and nothing more. That they are at the mercy of Regional Council.

We feel that the local councillors had every right to bully the bullier right back. It was not an easy thing for them to do as very few ever stand up to our unelected regional chair. We must give them credit for doing so, and for trying their best to get the money needed for Clarington to have an independent peer review done of the region's consultant's work, which is badly needed. The region still wants to tell Clarington which studies they can do and which are important or not important to Clarington. We believe Clarington (and Clarington Staff) are in a much better position to decide what is best for Clarington than Durham Region is. We would give all four Local Councillors a B to B+. They need more information to do their jobs, and they are trying their best to get it, with no help from the Mayor or 2 Regional Councillors. We would certainly not deduct any marks for their "message" that was sent not only to Chairman Anderson, but also to their colleagues, Abernethy, Trim and Novak.


"This is an issue council must be united on and stifling debate indicates this is a fractured group. It’s imperative that Mayor Abernethy and Regional councillors Charlie Trim and Mary Novak try to find some common ground with their colleagues before this debate scars council for good."

The local Councillors didn't stifle any debate. There is plenty of debate on this issue. Chairman Anderson was not present for "debate". He was there to send his "strong message" as he stated at an earlier Regional Committee meeting. We've been told by reliable sources he made his intentions very clear at that meeting. It is the Regional Works Chair (Trim) and Mayor Abernethy who seem to want to stifle the debate, reducing it to the false choice of "landfill or incineration" again and again.

It is imperative that the Mayor and two regional councillors start treating their colleagues at Clarington Council as equals, making sure they have all the information from the region that affects Clarington. It is imperative that they become a bit humble, and realize they are ALL paid by the residents of Clarington, and that includes Chair Anderson. They work for us and they should listen to us. They need to be reminded every now and then it seems. They do not seem to realize how this all looks to residents who see them leaving out the residents as well as the Local Councillors at every turn. We would give Novak a C for a grade so far this term, with Trim receiving a C- for his short fuse and kowtowing to Regional interests over Clarington interests.

"For his part Regional Chairman Roger Anderson has attempted to be as helpful as he can when it comes to EFW."

We disagree with this statement. Regional Chairman Roger Anderson has attempted to drive the process to conform with his personal "vision" and preferences. He refuses to listen to the concerns of residents and continues to try to denigrate them when they have the audacity to speak up as delegations to voice their concerns. This unelected Chair drives Regional Council, not the other way around. One more excellent reason to reconsider direct election of the chair by the residents of Durham. He doesn't feel he needs to be accountable to us as we don't have the opportunity to vote for him. He doesn't care what we think, only those at the regional level who can continue to appoint him to the top job in the region.

"There have been numerous public meetings on the issue and he’s been an active participant in most, if not all of the discussions on this technology."

Oh yes, a far too active participant in his efforts to stifle any opposition to his "vision", while trying to appear that he is listening to residents. The EA process demands the public information sessions that are being held. It is not at the request of the Chairman. He has no choice in the matter. He attends some (not all) of the meetings as they are an opportunity to put his spin on the subject.

"In turn, regional councillors have been supportive of the chairman in the knowledge that you have to show respect to receive it in return."

Respect? That's not respect...

We hope things change in the coming months and years. The split is a problem for Clarington but we lay the blame squarely at the feet of the Regional Councillors (Abernethy, Trim and Novak) with their behaviour toward both the Local Councillors, Staff (not supporting their request for necessary independent studies that were larger in scope than the region wanted) and residents (asking them banal questions in an attempt to discredit their viewpoints).

To her credit, Novak has not declared her undying support for incineration for Clarington, but her actions at Regional Council do show that she is supportive of the Regional Chair's "vision", or so it appears. Again, she does not want to listen to residents and makes it clear when she walks out of meetings when locals are presenting as delegations, as does Mayor Abernethy. We have come to expect such rude behaviour from some of the Regional Councillors such as Councillor Johnson for example, but not from our own Clarington representatives.

Something has got to change, but the blame cannot be laid at the feet of our Local Councillors who seem to be at least trying to do their best for our municipality with poor treatment and lack of information from our 3 regional representatives.

We look forward to an awakening by those three and an effort to work together for the benefit of Clarington rather than only the region in the future. Is it conceivable that over the summer recess they may come back with a renewed vision for Clarington and an ability to work with, rather than 'above' our Local Representatives?

14 Jun 2007

Whoosh! Grand incinerator plans go up in smoke

JOHN BARBER - Globe & Mail
June 14, 2007

Last week, all the regional governments surrounding Toronto were quietly, almost imperceptibly backing away from their grand schemes to "demonstrate leadership" by burning their garbage in allegedly high-tech incinerators. Today they're running, their tiptoe retreat becoming a heel-flashing rout.

First to bolt was York Region, which formally abandoned a long-established partnership with its neighbour, Durham, to build and operate a $250-million mass-burn incinerator on an equal basis.

Instead of paying for half the facility and agreeing to use half its capacity, York has proposed instead to contribute 12 per cent of the cost of building a Durham-owned burner -- and to reduce its obligation to stoke the thing accordingly. Meaning it will never be built.

Yesterday, Halton Region outpaced York when its planning committee, led by new regional chair Gary Carr, voted unanimously and definitively to cancel its once-grandiose plan to build a large incinerator to burn garbage from across Greater Toronto. Halton saw red flags everywhere and responded promptly with a white one.

Today, officials on the other side of the lake are meeting to formalize the divorce of another two regional partners -- Hamilton and Niagara -- who until recently have been happily planning to build a burner together.

Niagara was actually the first of all the regions to recognize the folly of incineration and to change course. Its desertion means that Hamilton, like Durham, is now on its own with a project that just became hundreds of millions of dollars more expensive and far riskier than it first appeared.

The risk factor alone is unmanageable. If nobody can guarantee a supply of burnable garbage - or agree to pay penalties when there's not enough of it to keep the fires lit - nobody will build an incinerator. The United States is crowded with jurisdictions that signed "put-or-pay" contracts to encourage the construction of unnecessary incinerators - and paid handsomely when there wasn't enough garbage to put.

The fear of not being able to "turn off the tap" at a garbage-hungry burner is one reason why Niagara has changed direction, according to regional waste management director Barry Friesen.

"The public has been sold that this is a silver bullet to solve the waste problem," Mr. Friesen said. But it's nothing close to that, he added, emphasizing that incinerators worldwide act as barriers to future waste diversion.

While not formally abandoning Hamilton, Niagara has decided to let someone else take the first shot.

Halton cancelled its plans for the same reasons, according to Mr. Carr, with local public-health authorities intervening effectively. The region has enough landfill capacity to last decades, he said, and it made little sense to commit for decades to a hazardous technology that is said to be rapidly evolving.

"This is a new administration, a new chair and a new council with a whole different attitude to it," Mr. Carr said. Yesterday, they proved it dramatically - demonstrating leadership by deciding unanimously not to build an incinerator.

In truth - and as always in such affairs - it is Toronto that led the fight and deserves most plaudits for the sudden, surprise victory.

As long as Toronto had no place to put its garbage, its refusal to incinerate was considered backward by the suburban smart set who thought they knew a thing or three about modern technology and "acceptable" levels of air pollution. But that smugness evaporated when Toronto acquired its own profitable landfill - and so did the market for potentially burnable Toronto garbage.

It may take a few more months for the last stragglers to depart the late field of battle, but the result is unquestionable. Abandoning their hidebound ideas and irrational prejudices, local politicians throughout Greater Toronto are leading the way on a better path.

jbarber@globeandmail.com

13 Jun 2007

EA: Critique of the Waste Disposal Project

Guest Blog by Paul-André Larose, Ph.D., Oshawa, Ontario, CANADA. Submission to Durham Joint Works/Finances & Administration Committee on Tuesday 2007/06/12
- - -
EA: Critique of Reports 2007-J-24 and 2007-J-25 (Waste Disposal Project)

I - Introduction

Members of the Durham Joint Works/F&A Committee and members of the Audience, my name is Paul-André Larose. I reside in Oshawa.

You should know by now that I have a Ph.D. in Physics and that, as a scientist and resident of the Durham Region, I am extremely concerned by the proposal to build an incinerator in the area.

At this point, I should state that I am well aware that some of you take a dim view of people like myself who want to assist BEFORE the shovel gets in the ground. Personally, I would welcome the opportunity of someone trying to assist me on an issue, rather than to reject or ignore it.

For the purpose of this meeting, I will intentionally skip all the known scientific facts that I have previously attempted to articulate about incineration and instead, venture into the world of economic wizardry, i.e. focus on some economic considerations.

Once again, we will see that the NEWS IS NOT GOOD on the incineration economic reality.


II – On Report 2007-J-24

This report stresses that the emphasis will remain on the residential aspect.

Province-wide, the report points out that the waste generation amounts to 14 MTY (million tons/year).

Of this there is 4.6 MTY diverted (presumably recycled) leaving 9.4 MTY requiring disposal.

Of this, some 6.2 MTY are ICI and 3.2 MTY are residential in origin.

This corresponds to 1.1 tonne/year of waste/garbage being generated by each and every resident of this province.

I ask the Works Committee members: do you not feel that it would be better to address the preposterous amount of waste rather than to try to get rid of it through incineration?

Let us put things in perspective and look at what this means at the individual or household level. This corresponds in total (i.e. including recyclable and ICI materials) to 40#/person/week or 160#/week for a family of 4 (or 320# where garbage is picked up every two weeks).

Thus, the two reflections that come to mind are:

1. This level of consumption (and the waste disposal problem that it thus creates) is nothing but OBSCENE.
2. There is twice as much of an issue in the ICI area as in the residential one.

Not only is the ICI waste stream twice as large as that of residential, but much of it is not processed by the Region and its disposal is simply contracted out. There is a need to process this waste in a socially responsible way and thus reduce the overall consumption rate.

Many commercial operators and merchants deplore the lack of recycling capabilities. In fact, I know of a case where ICI recyclables are brought to a residence so as to be put in the “blue box”.

These observations lead to two consequences:

1. the need to address waste disposal issues would be lessened (and thus be much less critical) if we were to address, not only residential, but also ICI generated wastes. There is such a thing as the Pareto principle stating that we should first address 20% of the factors accounting for 80% of the observable. For this reason, the importance of ICI should not be overlooked.
2. the remaining life for the landfill areas would be extended if we adopted a system approach to waste, instead of simply trying to make the result of our wasteful consumption go away through landfill or incineration.

The province-wide landfill capacity available is shown to be between 126 to 141 million tonnes. Is this not true that this should remove the urgency assigned to year 2010?

Is it not true that we have some time to properly address the issue and need not join into the incineration stampede?

In other words, do you not think that there is ample room to address the issue at the source, rather than to build an INCINERATOR to get rid of this blatant display of wastage?


III – On Report 2007-J-25

This report makes a rather disturbing statement: it asserts that “York could not make a commitment at the present time sufficient to retain a 50% ownership level in the project”.

Is this is a mild way to say that Durham Region, after having looked long and hard to find a partner in this venture and thus reduce its financial exposure, is now being asked to foot most of the bill, practically as if it were alone in this venture?

Is there not a little of tokenism in the small ownership that York contemplates?

Would such a small ownership on the part of York not transfer the economic burden entirely to the Durham residents?

Is it not accurate to say that while York would limit its exposure to about $17 – 22 Millions, Durham would possibly be on the hook for $130 – 175 Millions, whereas it was previously limited to $125 Millions in the case of the 50-50 arrangement?

In addition to the capital cost, would it not be exact to say that the processing of a lower tonnage would increase the operating cost, as previous studies have demonstrated, and thus make incineration still more expensive?

Thus, is it not true to say that Durham would end up with the financial risk, the health problems and part of the York garbage and ashes?

Is it not true also to say that this is NOT a very smart move on the part of Durham Region on the basis of economics, in addition to all the other previously outlined arguments which militate against that big “landfill in the sky” resulting from incineration?

Given this financial reality, would it not seem highly improper for this Region to send a delegation to Europe to “study incinerators”?

How many taxpayers’ contributions will it take to pay for a trip of questionable value?


IV – Recommendations

Truly, the economics of the proposed incinerator do not make any more sense than the scientific ones.

For this series of reasons, I hereby request the Durham Joint Committee to put the incinerator concept to rest and start dealing with the garbage issue in a way that addresses the source of the problem, rather than its manifestations.

This is somewhat akin to drug use and misuse; one can use drugs to kill the pain, i.e. the manifestations, without really resolving the reason for such pain or one can instead address the root cause of the malaise, i.e. the source.
- - -

Executive Summary

The financial implications of the project are such that incineration should be viewed as a flawed project both from the financial point of view as from other previously discussed aspects such as Public and Environmental Health.
= = =

12 Jun 2007

Health Implications of the Proposed Waste Disposal Facility

Guest Blog by Paul-André Larose, Ph.D., Oshawa, Ontario, CANADA. Submission to Clarington GPA Committee on Friday 2007/06/08

Health Implications of the Proposed Waste Disposal Facility

(… or, “it is difficult to keep the Ship of State afloat if the importance of hull integrity is not being appreciated!”)

I - Introduction


Members of the Clarington GPA Committee and members of the Audience, my name is Paul-André Larose. I reside in Oshawa, Ontario, CANADA. The Clerk should note that I will forward a digital version of this presentation.

I have a Ph.D. in Physics. As a scientist and resident of the Durham Region, I am extremely concerned by the proposal to build an incinerator in the area.

First however, I want to stress that I do not deny that we have to do something with our waste; like death and taxes, this is a reality that cannot be ignored. And addressing this cannot be without some consequences.

A solution must be identified on the basis of the optimization of certain variables, while not adversely impacting certain others, known as “fixed constraints”.

In particular, it is essential not to attempt to address the waste disposal issue in a way that will create new problems elsewhere, particularly in the public health area.

II – Concerns

Why am I concerned about the implications of what is currently being contemplated?

I am concerned because we appear to be “putting the cart before the horse”, namely we evaluate and debate potential locations without having prior examined the health implications of the proposed technology.

I am concerned because, with incineration, there will be unavoidable (and well-known) negative health and environmental consequences.

I am concerned because this goes against the sustainability of our agriculture, our environment and our health. Indeed, we are stewards of this world and we should always remember this Kenyan proverb:
“Take care of this Earth; your parents did not give it to you; your children lent it to you.”

I am concerned because there is now ample evidence on chemical burdening, increasing cancer rates and decreasing human fertility rates; this is not a speculative issue.

I am concerned because, as a resident of this country, I am ashamed of the inaction of our federal government in the critical matter of environmental protection; I want Durham Region to take an enlightened action, not compound the problem.

All of these are issues that should truly alarm all of us.

Moreover, I should state that, as a resident of the Region, I am concerned that I will UNWILLINGLY be contributing to the problem of what I suspect, if rationality prevails, will be an UNWILLING host.

III - Implications

“So what’s the fuss?”, one may ask. This technology will introduce two formidable enemies into the biosphere:
dioxins and furans, whose toxic concentrations are measured in pico-grammes, i.e. in billionth of a billionth of a gram (10**-12 g) or a billionth of a microgram;
nano-particulates, i.e. particles whose linear dimensions are of the order of the nanometre (10**-9 metre), that can readily migrate through membranes such as lung partitions and thus find their way into the blood stream and accumulate in organs (recall that visible light is in the 400 to 700 nm).

This is part of what we know as scientific FACTS.

For these substances, there are NO Safe Minimum Exposure levels and doses. Nano-particulates are known to migrate through partitions such as pulmonary walls and end up within the human organs. In dealing with such substances, we cannot adopt a “Solution by Dilution” approach.

It should be pointed out that incineration will not only have negative consequences on public health, but also on health care costs; this will no doubt be of interest to those interested in monetary matters.

IV – By-products

Incineration will NOT eliminate the need for landfill. In fact, it may exacerbate it, as the landfill requirements not fall into the hazardous by-products category.

Typically an incinerator leaves some 30% weight in terms of pit ashes and fly ashes; these must be disposed of in a secure landfill site. For a 250kt/year incinerator, this means 75kt/year ashes, or about 200 tons/day (calendar day).

With incineration, some 70% of the incinerated matter also go up the stack. For a 250kt/year incinerator, this corresponds to 175kt/year being sent in the atmosphere, or about 480 tons/day (calendar day).

This is also part of what we know as FACTS. Do I need to tell you where all of this is going to end up?


V – The Precautionary Principle

There are also FACTS whose long-term consequences are still speculative, i.e. we suspect them and they are yet not clear.

The literature is replete with instances of contamination on individuals who did not come in contact (or so they thought) with offending chemicals, i.e.
chemical burden on the human body (Federal Parliamentarians – Jan. 2006);
genetic damage and human fertility (W.H.O. conference speaker – Fall of 1999).

Even in the case of persons who did come in contact with a substance, compliance with the “accepted norm” is not a guarantee that the operation is safe, as such norms reflect the knowledge of the day.

For example, there is the tragic case of New Brunswick workers exposed decades ago to toxins and who are now suffering the consequences. Their exposure levels were, at the time, well within the “accepted norms”. There are numerous other instances with unexpected side effects, e.g. thalidomide, VIOX, radiation doses, lead piping, etc…

The fact that the exposure was, at one time, within legal limits now provides little solace to those whose health was irretrievably affected. In critical issues, a technology should NOT be accepted simply because it meets certain “standards” then in force.

In such instances, would it not be eminently reasonable not to jeopardize the single planet and the single life that we have by adopting a precautionary approach in the matter?


VI – Recommendations

For this and many other reasons, I hereby request the Clarington Council to clearly recognize the health aspects perils associated with the selection of any waste treatment technology.

It should adopt a position that Public Health and Environmental Concerns are primary issues that cannot, under any circumstances or any pretense, be compromised or sacrificed.

It should mandate its representatives to Regional Council to articulate this position.

It should acknowledge that good stewardship is good environmentalism which itself is good economics.
- - -

Executive Summary

Any waste disposal technology that has a negative impact on Public and Environmental Health should not be considered as suitable for waste management purposes.
= = =

10 Jun 2007

The evidence is in: Halton's incinerator folly is toast

JOHN BARBER - Globe & Mail
June 6, 2007

Once again, on behalf of all Torontonians, allow me to extend sincere gratitude to the suburban municipalities now flirting seriously with incineration and similar "thermal treatments" of household wastes. Every step forward they take reconfirms the folly of their path.

But the department headed by Bob Nosal, medical officer of health for Halton Region, deserves special credit for offering the most important public service so far: a scarlet-red flag warning the easily deceived that building any such device, despite prevailing happy talk about "acceptable" levels of pollution, will hurt people - or, to use the phrase preferred by Halton bureaucrats, "be associated with some increase in adverse health impacts."

Until now, the folly of incineration has emerged in the form of inconvenient truths popping out of the environmental assessments of impending new incinerators in Durham and Niagara - hard evidence about emissions, costs and alternatives to replace the easy assurances heard earlier on the sales floor.

Dr. Nosal's intervention is the first rebellion to emerge from within the ranks of the promoters.

It takes the benign form of a peer review of "Step 4a" of the region's plan to build an incinerator, in which it purported to identify and describe the prospective facility's "potential health and environmental effects." Written by medical scientist David Pengelly, recent recipient of a City of Toronto Green award for his work on air quality, the review gently but thoroughly demolishes official assurances that modern incinerators are benign.

"I'm a scientist," Dr. Pengelly said in an interview. "I'm not convinced by assertions, I'm convinced by evidence." The Halton report, he added, offered no evidence to support the contention that modern incinerators, despite being cleaner than their predecessors, are in fact safe. They emit the same dangerous pollutants as earlier incinerators, albeit less of them. But how much is that? Step 4a doesn't say.

"I'm prepared to accept that things are better than they were," he said. "My problem was that there wasn't very specific scientific evidence brought out to show how much better they are."

Dr. Nosal, the official who commissioned the review, is already advocating strict abatement of existing pollution in Halton's already "taxed" airshed - a position unlikely to herald approval of new sources of dangerous pollution. He and his crew deserve "a great deal of credit for taking an active role in making sure that these health issues are addressed right from the very beginning," Dr. Pengelly said. "I can tell you that's not happening in other municipalities."

Leaving aside its welcome exposé of incineration's health hazards, the Halton report includes more than enough latent ammunition to destroy any hope a burner might soon be built there. The idea is absurd on its face: Halton's existing landfill is big enough to last until 2030, long before which it could easily be expanded to take garbage until the last person alive today is gone.

Mercifully, the bureaucrats have abandoned their nutty idea that Halton should "take a leadership role" by building a giant incinerator to compete with facilities throughout the province. Unlike some of their colleagues elsewhere, they acknowledge that recent developments - especially the sudden appearance of 50 million tonnes of new landfill capacity in Southern Ontario - have destroyed the viability of such schemes. Faced with the disappointing fact that Halton has no need for an incinerator, they are reduced to recommending a teeny tiny one.

This ongoing retreat is a fascinating event for which suburban taxpayers - and everybody who breathes - should be grateful.

Stripped of its rationale, its hazards exposed, the current push to incinerate is revealed as a kind of infrastructure adventurism, led by a tunnel-visioned cadre of engineers and consultants, that can be brought to a halt with no negative consequences.

9 Jun 2007

Durham/York Residual Waste Study - PUBLIC NOTICE

Energy-from-waste project update and
Health and Ecological Risk Assessment Study:
Public Information Sessions

The Regions of Durham and York are participating in a joint study to find a better way to manage the residual waste (garbage) remaining after maximizing recycling and composting programs. Since 2004, the two municipalities have been addressing the social, environmental and financial impacts of resolving this issue by way of an “Individual” Environmental Assessment (EA) under the Provincial EA Act. A Joint Waste Management Group comprised of residents, local politicians and Regional staff oversees the project and the general public is involved through the public information session process.

A short-list of sites has been identified and consideration of the final site is underway using a series of evaluation criteria developed through the EA public consultation process. Four sites in Clarington have been identified as potential sites.

An important component of the EA study is to investigate the potential impact to human and ecological health from an energy-from-waste (EFW) facility. The Regions initiated a health and ecological risk assessment study in 2006 and the results will be presented at the public information sessions as shown below.

On June 18, the Region of Durham will be hosting a drop-in style information session on the EFW project. Sessions on June 20, 27 and 28 will update residents on the EFW project as well as results of the health and environmental risk study. Additional information sessions are also planned in York Region. Visit the study website for information on all public information sessions.

An informal drop-in information session
will be held from 2 to 7 p.m.

Monday, June 18
Faith United Church
1778 Nash Road
Courtice

All other information sessions will be held from 6:30 to 9:30 p.m.
Formal presentations begin at 7:00 p.m. at the locations shown below


Wednesday, June 20
Clarington Beech Centre
26 Beech Avenue
Bowmanville

Wednesday, June 27
Faith United Church
1778 Nash Road
Courtice

Thursday, June 28
Newcastle Hall
20 King Street West
Newcastle

To review the EA study documentation, please:
· Visit your local municipal office or library.
· Visit the study web site at http://www.durhamyorkwaste.ca/.
· Call 1-866-398-4423.


*********************************


It's good that we should finally get "results of the health and environmental risk study". Many people will be judging the thoroughness and quality of that information, especially due to the fact that so many don't seem to have much confidence in the objectivity or completeness of information presented to residents OR to municipal politicians to date.

The Regions of Durham and York are participating in a joint study to find a better way to manage the residual waste (garbage) remaining after maximizing recycling and composting programs.

We don't feel that continued effort or maximizing effort toward reducing the waste stream is a priority for Durham Region. What is our present diversion rate? The numbers vary, depending on who you ask and when you ask the question, but we have been told by the Region that it is as high as 55% or as low as 44%. At any rate, they seem to be saying that we won't ever get much beyond where we are now. Well, that is certainly true if they don't concentrate heavily on it - on educating the public, on making more services available (such as removal of batteries, electronic equipment and other hazardous household waste from the garbage stream). They will need to 'feed' the incinerator, and are even discussing shipping IN waste from neighbouring regions such as Peterborough, Northumberland, etc. Is this a "made in Durham" solution? On a "put or pay" system, if either of the municipalities does not provide enough garbage to keep the incinerator burning efficiently, they must pay (in taxpayer's dollars).

Toronto's goal for 2010 is 70% waste diversion. Other cities have an even more aggressive target. The city of Markham is already at a 70% diversion rate after only a little over 2 years of aggressive education and public participation, and are aiming for 75% by next year. They have plans to continuously increase diversion and to get to as close to 100% diversion as they can by 2010. Check out Halifax, Seattle, and other communities in California, New Zealand, and now India to see the growing trend toward the "zero-waste approach".

Yes there is garbage. Yes we need to get rid of it. But we also need to concentrate on producing less of it and smarter ways of dealing with what is left that can't be reduced, reused, recycled or re-invented.

If we continue down the path toward incineration, it is another "out of sight, out of mind" scenario. Landfill will still be needed for the ash produced by incinerating the garbage. And the amount of toxins being released into our already polluted air will increase significantly. Greenhouse gasses and climate change should be a concern, and even more of a concern is the health of residents not only close to the incinerator, but also those farther away since those airborne pollutants, the toxins and chemicals, are spread far and wide.

It is imperative that our politicians take a step back, stop forcing this project through in an accelerated time frame, and go back to seriously consider Alternatives To their present choice of "thermal technology". The time to do that is NOW.

We hope to see a lot of residents at these upcoming Public Information Sessions, especially from Clarington but also from all over Durham Region and from York Region too. We hope residents will ask a LOT of questions and not be satisfied with partial answers, round-about answers, innuendo rather than cold, hard facts.

Stay tuned.

3 Jun 2007

Waste Diversion and Stabilized Landfill - a choice

Niagara Region and the City of Hamilton partnered to undertake the WastePlan EA Study to develop long-term disposal capacity for municipal waste remaining after diversion serving the needs of both municipalities. Eight distinct disposal options were considered and evaluated in the study. The options can be organized into three general categories as follows:

1. Mechanical and biological treatment (MBT) and landfilling of stabilized residuals (with an option to include biogas recovery).

2. Thermal treatment (with options including recovery of materials from the ash/char, alternative fuel, and biogas recovery).

3. Conventional landfill (including an option of landfill gas recovery and utilization).

This partnership was begun in Fall, 2003.

In December of 2005 a report was prepared for Niagara/Hamilton Joint Group entitled ‘Draft Report on the Evaluation of “Alternatives To” and Selection of a Preferred Disposal System’ which recommended thermal technology with recovery of energy and recyclables as the preferred option. MBT and stabilized landfill was identified as the next preferred alternative, and was the preferred landfill-based option. (Why do they characterize MBT and stabilized as a landfill-based option without the zero waste component included? Where is Zero Waste as an option?)

Sound familiar? The same "Alternatives To" were suggested to Durham Region, with the same recommendation of preferred option - thermal technology with recovery of energy (EFW), which Durham Region accepted without further investigation. Who were the consultants who made this recommendation to Niagara Region and the City of Hamilton? MacViro and Jacques Whitford. Same consultants that Durham Region hired. Tell me Durham Region didn't know ahead of time what the recommendation would be. If they didn't, why not? Did they pay for all these recommendations, full price, since the "Alternatives To" report had already been done for Hamilton/Niagara and who knows how many others previously? Gosh, some of the charts look SO familiar.

Following release of the December 2005 report a number of comments were received from the public and other stakeholder groups regarding the study and its recommendations. (Gosh, they didn't comment BEFORE the report was received - which has been a criticism by one resident and several Regional Councillors, including our own Mr. Trim, that residents were not making delegations to Council BEFORE getting the sparse information from the information sessions hosted by the Region).

While some of these supported the recommended option, other comments from some non-governmental organizations as well as the public opposed the preferred option. (Opposition from both groups is higher in Clarington - and was also in East Gwillimbury - due to further information gleaned in part from further investigation done by the Niagara/Hamilton Waste Plan Joint Working Group - something NOT done yet by Durham Region).

In particular, questions were raised about the evaluation of the stabilized landfill options. These comments led the WastePlan Joint Working Group to request additional information on stabilized landfill technology, and in particular a comparison of stabilized landfill technology relative to conventional technology landfill. So a Study of Stabilized Landfill was prepared by Gartner Lee and Golder Associates, independent consultants, not MacViro. It was completed in March, 2007, and since that time, Niagara has decided it will NOT agree to incineration, and instead has chosen increased waste diversion with stabilized landfill as the best course of action to take.

The Gartner Lee Stabilized Landfill Report was also provided to MacViro but apparently didn't change their pro-incineration recommendations to Durham Region.

A few facts: MBT treatment and stabilized landfill technology is practiced much more extensively in Europe than North America. A key reason for this difference is the requirements of the European Union’s Landfill Directive 1999/31/CE, which states:
  1. only pre-treated wastes are allowed to be landfilled after July 2001; and
  2. the amount of biologically degradable MSW to be landfilled must be reduced in a phased approach to 75% by July 2006, to 50% by July 2009, and to 35% by July 2016 of the total amount of biologically degradable MSW produced in 1995.

Definition of Stabilized Landfill: A stabilized landfill accepts waste materials which have been pre-processed, or stabilized, mainly to reduce the readily biodegradable organic fraction of the waste prior to landfilling so that the potential for landfill gas generation is diminished and leachate strength is reduced. Stabilization of the waste stream occurs through a group of processes typically known as mechanical and biological treatment (MBT), which can include removal of recyclables, shredding, removal of refuse derived fuel (RDF), aerobic or anaerobic composting, and desiccation. Waste delivered to an MBT facility has typically already undergone some form of source separation.

From the Stabilized Landfill Summary Report:

The development of MBT and stabilized landfill sites in EU were driven by the need to comply with the EU directive 1999/31/CE which required a progressive ban on the disposal of biologically degradable organics in landfills. Italy and Germany have introduced different national regulations to comply with the EU directive with a key difference being the extent of stabilization required prior to landfill. The advent of MBT plants is also on the horizon in the United Kingdom with several facilities just getting into operation or well into the permitting phase. In all the cases indicated above, significant efforts are in place to implement 3R programs to reduce the volumes of material needing to be processed, efforts which in many cases lead to source separation programs, all to varying degrees.

A fraction of the MBT processed material is processed in incinerators prior to final disposal since the process can generate RDF material with a relatively high calorific value.

In certain jurisdictions, MBT and stabilized landfill sites are seen as preferable to the alternative of incinerators (conventional landfills are no longer an option in EU countries except in the UK which is using an allowance for an additional 4 years to comply). The main drivers for this preference are (Faviano, 2005):
a) lower cost;
b) greater flexibility (e.g., don’t have to meet a minimum through-put and calorific value of the waste for cost effectiveness and efficient operation); and
c) proven examples of successful facilities.

So, are we behind the times, going with old technology that is non-sustainable, rather than thinking ahead to the future, and changing the way we look at garbage in the first place?

One other thing - let us look at the time-frame for these Niagara/Hamilton studies.

Fall 2003 - Partnership between Niagara and Hamilton
January to August 2004 - Development of Draft EA Terms of Reference
August 2004 to February 2005 - Ministerial review of Terms of Reference and approval of document on Feb 7/05
February 2005 - Early 2007 - EA Study of the Niagara-Hamilton WastePlan is undertaken resulting in the selection of a preferred approach, technology and sites. Preferred approach - Waste Diversion and Stabilized Landfill.

Now contrast that with the greatly accelerated time line for Durham Region. Because the Province has approved an additional bank of landfill (some of which could/should be made into stabilized landfill sites as approvals are basically the same from the Province), there is no longer the 2010 emergency time frame as the Region and it's consultants keep insisting there is. Why not take a little longer to do it RIGHT instead of doing it FAST.

And all this ties in with the Region trying to limit the independent studies that Clarington wants to do (at least staff and our local councillors do). More on that next time.

We must once again thank Councillors Foster, Hooper, Robinson and Woo for going the extra mile to ensure Clarington is able to do its due diligence and get INDEPENDENT peer review and necessary studies done for the benefit of our municipality and residents, not for the benefit of Durham Region.

31 May 2007

Incinerator Chronicles - Dissing the Chair?

At the May 27 meeting of Clarington Council, some interesting events took place. There were 12 delegations on the agenda to speak in opposition to the Energy-From-Waste (Incineration) being promoted by Durham Region and one delegation in favour. The most likely on the preferred site will be within the municipality of Clarington, since the town council of the only other potential site outside of Clarington, East Gwillimbury in York Region, voted last week to make East Gwillimbury an "unwilling host".

Clarington Council decided we need an independent peer review, as well as possibly additional studies to help them to decide whether Clarington should be a willing host or not. So they asked Planning Department Staff to come up with a report, outlining what studies may be needed.

On May 23, Durham Region Finance and Admin Committee came up with a resolution that would limit the Clarington review and studies to a cap of $200,000. If that was not sufficient, Clarington could come back and ask Regional Council for more money. However, there is a time line attached to the site selection, which is in September. Regional Council has only one more meeting (3 weeks from now) before they break for summer - until September. It appears they don't want Clarington to do their "due diligence" and complete their review before the September site selection. Originally, Durham and York Regions approved a motion that said, "...that such adequate funding shall include the costs of all necessary studies and legal advice incurred by the potential host community to investigate and complete its due diligence in arriving at its decisions whether or not it will become a host community for the EFW facility."

Also at that Finance and Admin Committee meeting, which our Mayor Abernethy sits on and Charlie Trim was present for I was told, Regional Chairman Anderson made it a point to say that "a message needs to be sent" to Clarington before the May 28 Council meeting. The intent was made very clear - the Region wants control over which studies can be reviewed independently by Clarington. That's ridiculous. How could they possible call it an "independent review" if Durham is directing which of their consultant's studies can be reviewed? The Region wants this incinerator project to go through, one way or another. So Mr. Anderson showed up at Clarington Council on Monday night, and asked that he be allowed to address Council. Sending a copy of the motion to Clarington Council wasn't enough. He wanted to drive home his message in person.

This is when the fireworks began. All 4 local Councillors (Foster, Hooper, Robinson, Woo) voted "no". The three Regional Councillors (Abernethy, Trim, Novak) voted yes. The Regional Chair was denied his request to speak! Apparently that has never happened to him before, and he beat a hasty retreat from Council chambers after that vote, with at first a stunned, then an angry look on his face. His right-hand man in this endeavour, Cliff Curtis, accompanied him.

Later on, all 3 of our regional reps spoke about this - Charlie Trim being the most livid. He lashed out at the local councillors and everyone else. He was absolutely inconsolable. Mary Novak said she had wanted Mr. Anderson to be able to speak so he could give more information to Council and the residents, but what information was he there to give? He was there to pressure the local councillors, who had outvoted the 3 regional councillors the week before regarding approval of the peer review report, into changing their votes to agree with their regional counterparts. He even said he was there to make it clear to Clarington Council that the Region was not giving them a blank cheque. Council and Staff already knew that. There was no further information for him to give.

Mayor Abernethy's reaction and comments were particularly disappointing, but not surprising, as he and Councillor Trim are such strong supporters of "everything Anderson". Mayor Abernethy stated his position very early on, before all the reports were in (and they still are not in) that he is in favour of incineration and totally against landfill. He doesn't seem able to grasp the fact that incineration produces toxic ash that must be landfilled - about 1/3 of the total mass of garbage going in to the incinerator comes out as ash. The other 2/3 goes out of sight, out of mind, into the air to contribute not only to greenhouse gasses (I guess he doesn't care a bit for global warming), but also toxic emissions that affect human health as well as ecological health of surrounding areas. Where does he propose that toxic ash go? Do we keep it within Clarington or Durham Region borders so we can fulfill their grand claim of taking responsibility for our own garbage and a "Made in Durham solution"? They just don't get it, do they? They will need landfill for their incinerator and they will contribute even more to our smog days, global warming, and health problems. Do they even care that the emissions from burning garbage are worse than those from burning coal for energy? They care apparently about the ground but not the air we breathe. And they want to put in an unsustainable technology rather than putting all that money and energy into reducing waste, recycling, reusing, etc. Increasing waste diversion will reduce the need for landfill and is so much cleaner, safer, and LESS EXPENSIVE too! Also much more socially acceptable.

While it was certainly out of the ordinary for the Regional Chair to not be allowed to speak at a local municipal meeting, I can't fault our local councillors for doing it. They felt they had to send a message, then they succeeded in doing so. They were sending a message to the Region that Clarington needs to do it's own due diligence. After all, right now the only "studies" we have are the ones provided at those one-sided Public Information Sessions hosted by Durham Region. They also succeeded in sending a message to our Mayor and two regional councillors. Our local councillors play as important a role as do our regional reps, maybe even more so. They don't have a conflict of interest when it comes to standing up for Clarington as our regional councillors seem to have.

Remember that Durham Region decided a year ago that thermal treatment (incineration) would be their preferred method of dealing with municipal waste. How they came to this conclusion is beyond most of us, since they didn't have enough information to make that decision. Even now, the consultants hired by the region to push this project through to completion give us answers such as, "We can't answer that question", or "We don't have that information yet" when asked specific questions regarding health, emissions, etc. If the consultants don't have the information, neither does Council, so how did they make their decision a year ago? Crystal ball?

People ask, how biased are the reports being promoted by the Region's consultants? All you need to do is to attend one of their information sessions and hear them tell us that everything is good. There are no drawbacks to incineration, they say. The particular technology they will be using will be very clean and only emits water vapour from the stack they say, showing a picture of a little puff of white smoke. Problem there - the specific technology to be approved has not been decided yet. They give round-about answers to questions and don't answer anything that might be negative. It's no wonder that our gullible Regional Councillors have been taken in by it all - they hear only positive results regarding incineration. And they also hear how terrible landfill is. They haven't a clue about stabilized landfill, how it can be used in conjunction with enhanced waste diversion for a better solution to the garbage problem than incineration. The part to concentrate on is WASTE DIVERSION, not landfill. Certainly not incineration.

Our Regional Councillors keep touting the wonders of European Incineration - and those who have already been there are going over again, with a few additions, on our dollar of course. This trip should be restricted to those who have not gone previously, but that's another story. But why do none of them know anything about stabilized landfill when MBT treatment and stabilized landfill technology is practiced much more extensively in Europe than North America. A key reason for this difference is the requirements of the European Union’s Landfill Directive 1999/31/CE, which states: "only pre-treated wastes are allowed to be landfilled after July 2001; and • the amount of biologically degradable MSW to be landfilled must be reduced in a phased approach to 75% by July 2006, to 50% by July 2009, and to 35% by July 2016 of the total amount of biologically degradable MSW produced in 1995."

They sure didn't get much of an education on previous trips, if they learned nothing about stabilized landfill, and since most of them seem to believe that incineration is the answer to landfill and none will be necessary once we get that shiny new incinerator! How naive.

If the Region wants us to host that monster, they should pay for our "due diligence" so the best decisions can be made by our Council for our residents. But the last thing the region wants is for us to get the real truth from independent studies. Our local councillors did the right thing. And if our staff needs to run over the $200, 000. cap, then our local council should declare Clarington NOT a willing host. They could do it right now and not have to go to the expense, but these studies will help us if we have to go to court to fight this even after being declared unwilling.

Remember that Mr. Anderson has made it VERY clear a number of times when asked, that even if we are not a willing host, it will be up to Durham Region, and not Clarington, whether we are forced to host the incinerator. The bully strikes again. One more reason the Regional Chair needs to be elected by the people instead of re-appointed time after time after time by his buddies on Regional Council. He needs to be accountable to US, not just to his friends. He has quite the hold over most (although luckily not all) of those on Regional Council. There are a few who go their own way, and they are to be commended. But most, sadly, don't. They may not realize it, but they look like lap-dog automatons to those of us who watch those meetings on TV.

So thank you to Councillors Foster, Hooper, Robinson and Woo. We appreciate that you are looking out for our best interests, and that you have had the guts to stand up to fierce pressure from not only the Region, but also from our own 3 regional representatives (Abernethy, Trim and Novak). If you can stand up to them, it shows that the Mayor's ridiculous accusation that you are intimidated by delegations is another of his newly off-the-wall ideas. We see it as you listening to residents, not being intimidated by them. You have shown strength and caring and a loyalty to Clarington that the other 3 could learn from. We thank you and will continue to support your efforts.

30 May 2007

Incinerator Chronicles - Comic Relief?

We know there has been growing opposition to the proposed garbage incinerator, euphemistically called "Energy From Waste". There is at least one vocal supporter of the incinerator who has been providing some comic relief to all the serious concerns of the majority of residents. She states that all questions have been answered satisfactorily by the Region's hired guns (consultants) at all the Public Information Sessions. She must have been at different sessions than those most of us attended in Clarington, since so many direct questions were answered with, "Sorry, we don't have that information yet". Or, "Sorry, we haven't done those studies yet". I suppose to someone who blindly can't wait for the incinerator to be built, those non-answers are satisfactory. Most logical, rationally thinking persons require something more than "We don't know" to have it even qualify as an answer.

This resident's antipathetic complaints about those who did not attend the very earliest so-called information centers that most people never even were aware of were totally offensive. She seems so filled with herself that she never bothered to think that the Region, and Clarington in particular, has had such rapid growth in the last few years that many of the people here today were not living here when those first sessions began. Others had very valid reasons for not being able to attend - health reasons. Young children, work schedules, lack of GOOD advertising.

Her superior attitude as well as her comments such as - Who cares about the children and grandchildren, what about US? - hit a sour note with everyone. That was in response to people who worry about the future generations and what we will be putting into the air with this monster incinerator. And if she wants to complain about those who only recently found out about this incinerator project, where has she been, since she only started speaking at Council last week, and has never spoken at Regional Council before. Where has she been? What is her excuse? We find her complaints about other residents offensive, as well as her lack of caring for the health and well-being of others, and her lack of understanding of the most simple of facts - that this incinerator will be adding to our air pollution on a large scale. Well, there are selfish, self-centred people everywhere I guess.

That same selfish resident also wants them to put a brandnew landfill right in Clarington, to bury the toxic ash from the incinerator. Even the extremely toxic fly ash, that right now is planned to be shipped to a special hazardous waste site in Sarnia because it is so toxic it can't be put into a regular landfill. But she has said she wants all the ash and unburnables to stay right in Clarington, right near the new incinerator. Let's make our world a bit more toxic, as well as Lake Ontario, our groundwater, our air... Let's keep that ash here in Clarington, but let's spew toxins (about 70% of the mass of the original garbage) into the air to be spread far outside of Clarington, far outside of Durham Region. Sure, a real "Made in Durham" solution. How responsible is that? Seems most of our regional councillors feel the same way. Bravo to our Local Councillors for wanting all the answers, and for giving our Clarington Staff the means to get those answers for them so that they can make an INFORMED, rational decision, unlike that confused pro-incinerator lady and unlike our Regional Council. That makes sense to us.

29 May 2007

Oshawa Motion says Ban the Burn


Oshawa Regional Councillor Nicholson has placed the following motion on the agenda for the next Oshawa Council Meeting, Monday, June 11 at 6:30 pm, and the public is welcome to attend.

Let's hope that our Clarington Council takes a close look at this motion and will take similar actions. The public is behind this by a huge majority. We are all becoming much more informed - more so than many of the politicians who are pushing this project on us. Many have not bothered to do any research into incineration, as they have their one-sided consultants giving them all the information they need - to keep pushing for it. According to Regional Consultants so far, there is really no down side to hosting an incinerator. It's all light and roses; all good. Only harmless water vapour emissions from the stack. Ash that will disappear and barely need to take up any space in landfills. No traffic problems, no infrastructure problems, not toxin problems. Health concerns? Heck no! It's as safe as other government sanctioned things like asbestos - oh, wait. I forgot, they changed their minds on that one. It's as safe as Thalidomide. Oh wait, they changed their minds on that one too. It's as safe as... well, you get the picture. Those dioxins and furans which have no safe levels at all, will be at a level that the government will tell us is safe. And we all trust the government (all levels), right?


~~~~~~~~~~~~~~~~~~~~~

MOTION

Whereas the Township of East Gwillimbury has unanimously opposed the location of an incinerator within its boundaries and has indicated that it is not a willing host community for an incinerator, and

Whereas the Region of Durham has consistently refused to support resolutions that would require any municipality in Durham to be a willing host community before being considered for an incineration site, and

Whereas sites in Clarington will cause a real and demonstrated health hazard to the residents of Oshawa, with prevailing winds depositing dioxin, furans, nanoparticles and other noxious and poisonous materials over large portions of Oshawa.

Be it resolved,


  1. That the Council of the City of Oshawa indicated to the Region of Durham and to the Region of York that it is not a willing recipient of the wastes and poisons discharged into the air from a proposed incinerator potentially located in the municipality of Clarington.


  2. That the Council of the City of Oshawa urges our neighbouring municipality of Clarington to join with East Gwillimbury to indicated its opposition to an incinerator being located in Clarington and that they pass a resolution indicating that they are not a willing host municipality for any potential incineration site.


  3. That the Council of the City of Oshawa urge the Region of Durham and the Region of York to respect the wishes of the local Councils by committing to a protocol that would not allow any incinerator to be located in any community that is not a declared willing host community by a resolution of its local council after public consultation.


  4. The Council of the City of Oshawa strongly urges all local Councils in the Region of Durham and the Region of York to support the actions taken in East Gwillimbury and to take similar actions to those included in this resolution.


  5. That a copy of this resolution be sent to all regional and local councils and council members in the Regional Municipalities of Durham and York and to all MP’s and MPP’s in ridings located within those regions.

~~~~~~~~~~~~~~~~~~~~~


We commend Councillor Nicholson and hope Oshawa Council will send their very strong voices to the Region for the benefit of Clarington, Oshawa and all Durham Region residents.


There is a better way than Thermal Treatment or Energy From Waste (INCINERATION). There are safer, less expensive, and much CLEANER ways to deal with trash. No one technology is absolutely perfect (yet), but experts are working on it. And to date, they have come up with a better way. Lets hope they will take the time to examine it.


20 May 2007

So, that's what the UN is for ...


Who knew? Apparently the United Nations was set up to deal with Climate Change. I didn't realize that global warming was such a big concern 60 years ago. I was taught that the United Nations was founded in 1945 to replace the League of Nations, in the hope that it would intervene in conflicts between nations and thereby avoid war. Perhaps our education system isn't quite what we thought it was, and we'd better straighten those history teachers out!

"I really do believe that climate change is a worldwide situation, problem, and I really believe this is why the UN was set up," said our Councillor Trim, one of our Regional Councillors from Clarington as well as Chair of Regional Works Committee.

In terms of climate change, "the leadership and programs should come right from the top," he said. "We on the local basis can do our small parts, but we need that overall top-driven initiative... in order to make it worthwhile, in order to make the great change that is required."

This from our Councillor who last week argued against establishment of a Clarington Green Community Strategy committee, and who appears to be in support of plunking down an incinerator to burn garbage right here in Clarington.

Is it any wonder why residents may worry about the ability of some of our Clarington Councillors to grasp the fundamentals surrounding complex issues such as the drawbacks and risks of incineration, the intricacies of a zero waste program, how best to deal with the reduction of residual waste? Will our Councillors be able to discern fact from fiction when it comes to what they are being fed by proponents of "energy-from-waste" (EFW) - which is just a fancy term for incineration? Will they understand the far-reaching and dangerous health risks posed by the emissions of dioxins, furans, and other harmful chemicals? You know, those oh-so-clean emissions we've been told about by the consultants - those white puffs of water vapour. Yeah, right.

Are they really listening or have they made up their minds? We wonder even more when we hear things of this sort...

Incineration - accepted around the world?

Incineration is not so accepted in Europe and around the world as we've been led to believe. There are protests against it in England, Germany, Japan, Malaysia, and so many other places. It's not so clean as we have been told, either. We want truthful answers from Durham Region, not the same old pap that passes for "information".

To watch any of the videos below, choose which video from the film strip at the right (scroll down to see entire list) and then click on the "play button" in the large screen to watch.




European Trip:
Will Durham Councillors travelling to Europe for 8 days starting on July 3 this year get to see/hear any of the anti-incinerator experts while there? Did they on their previous trip? I doubt it. The trip is being arranged by Ramboll Denmark Consultants, a company based in Europe that specializes in EFW facilities. Ramboll is a sub-consultant to Genivar Consultants (MacViro), and will be responsible for arranging the study tour to Europe.

That's right - have it all planned and tightly scripted by Subconsultants of MacViro - who are proponents of the incinerator hired by Durham Region, and who have been giving us all the one-sided information about how wonderful incineration is, how clean it is, how it is the best and only real solution for waste management for York/Durham.

Are you feeling more comfortable about the decision-making process now? We didn't think so.

17 May 2007

Public Notice on Incineration Report

DURHAM/YORK RESIDUAL WASTE STUDY [Incineration]

The Regions of Durham and York are jointly undertaking an Environmental Assessment Study to determine how to manage the residual solid waste remaining after blue box and green box waste diversion efforts [they have already made the determination - they want to build an incinerator]. The study has identified a number of potential sites in Clarington, as well as one in York Region, for the construction and operation of a facility to thermally treat [incinerate] the residual waste and to recover both energy and materials [recovery is not a priority - burning garbage is the priority].

The General Purpose and Administration Committee of Clarington Council will be considering a Staff Report with respect to the proposed studies and peer reviews the Municipality of Clarington would carry out on the Durham/York Residual Waste Study on:

DATE: TUESDAY, MAY 22, 2007
TIME: 7 P.M.
PLACE: Council Chambers, Municipal Administrative Centre
40 Temperance Street, Bowmanville, Ontario

A copy of this Staff Report may be obtained by contacting the Municipality of Clarington Planning Services Department at (905) 623-3379.

Should you wish to appear as a delegation in respect to this item, arrangements should be made through the Municipality of Clarington Clerk’s Department ON OR BEFORE TWELVE NOON ON FRIDAY, May 18, 2007 to have your name appear on the agenda. Please note that we cannot confirm the precise time at which the delegation portion of the agenda will be heard. The start time listed above reflects the time at which the General Purpose and Administration Committee Meeting commences.

********************************

Don't hesitate to sign up and speak to our Council about this very important incineration issue. Let our local politicians know how you feel about it. They have been told by the project consultants that there is very little public opposition to it - one of the things we have found to be untrue in their reports to Durham Region Councillors. Speak up at this meeting or regular Council meeting on May 28. Write a letter to Council (Local and Regional). Talk to neighbors. Do some investigating on the issue. Register your health concerns, traffic concerns, financial concerns. Remember that our politicians work for us - we are their employers. We're the bosses, not them. Remind them of that fact too.

You don't need to be confrontational - some of the politicians are on our side, but too few. Most just "go with the flow" and believe whatever the proponent consultants tell them, with no independent investigation on their own.

A few residents seem to think that the government would not allow an incinerator if it was not safe for our health. Need we remind you of asbestos? Thalidomide? Leaded Paint? PCBs? Pesticides? etc. If you want more examples, just ask.

Incineration is not a "clean" way of getting rid of garbage nor is it safe for our health or environment, as we are being told. Emissions of dioxins and furans (google them) are dangerous to all of us, but especially children.

12 May 2007

Let's clear the air

Did our Regional Council really investigate anything other than landfill vs incineration? How much did they really learn, other than what they were fed by proponents of incineration? Why didn't most of them bother to attend the May 9 Public Forum on Incineration hosted by the CAW in Oshawa, giving "The Other Side of the Story"?


We were given some "facts" in the Durham Works newsletter we all received in our mailboxes this week. One of the most disturbing statements made, however, other than the spin put on the emissions information, was this one:

"This exiting project has met with an overwhelming approval from most Durham residents..."

Whaaaaat? Where did they get that statistic from? Any of the polls I've seen including the Rogers TV poll, in newspapers or anywhere else have been overwhelmingly against this incineration project, and especially among Clarington residents.

We also heard the consultants tell Regional Councillors and the York/Durham Joint Waste Committee (most of whom never bothered to attend any of the Public information sessions - at least the ones held in Durham) - that there was little opposition to the incinerator project. That was pure fantasy. I'm not sure what's in their water, but it's more than a bit of chlorine!

People are quite upset that the Region decided on incineration... oh, excuse me... "Thermal Waste Treatment", or "Energy From Waste" - both euphemisms for burning garbage in an incinerator - that they decided on this with little input from the public. They say they held consultation sessions with the residents of Durham Region, but that was after they had already made the decision to go with incineration. They've done this all bassackwards from the start. Even now they are choosing a "host community" before they choose which technology they will employ. They are choosing a host community before even doing emissions investigations for this type of incinerator (because they don't know which type they will choose yet). They have chosen a populated area for the incinerator without considering the contributions to smog and the cancer-causing dioxin and furan emissions, among other things. They didn't even LOOK for a better alternative.

How about some REAL facts?

Incineration:

  • Very expensive. Money leaves the community once the facility is built. It takes 25 years to pay for the investment, by which time it must be refurbished or decommissioned and a new one built.

  • Needs a constant supply of waste. That's right - we'll need to produce enough garbage to fill the hungry beast to keep it running, 24/7.

  • The toxic ash produced from burning toxic plastics and other materials requires a "permanent" landfill, similar to that required for storing spent nuclear waste.

  • After 25 years of operation you are no closer to sustainability than you were when you started.
Doesn't sound like a very good solution to me. So what do we do with our garbage (discarded materials)?:

  • Avoidables (throwaway plastic objects)

  • Reusables (furniture, appliances - give to Goodwill and other charities, for example)

  • Toxics (paint, oil, batteries, etc).

  • Compostables (food scraps, some papers)

  • Recyclables (paper, glass, metals)

Residuals - what's left that has to be disposed of because of "bad industrial design)

Rather than a honking big incinerator, what we need instead is a souped up recycling program along with a Residual Screening and Research Facility plus Landfill for stabilized organics plus non-recyclables. These are:

Much safer and cheaper, and the money stays in the community.

  • Flexible - does not need a constant waste stream.

  • Landfill use decreases with better industrial design

  • Moving towards sustainability.
"When you build an incinerator you are advertising to the world that you were not clever enough - either politically or technically - to recover your discarded resources."

So, there we have it - a better alternative. Was this even considered? If so, why not choose the "better way"? If not, why not?

Next time we'll talk about some of the extremely harmful emissions. Remember that those incinerators in Europe are burning different materials than ours will be burning. They don't burn the same harmful plastics or other materials so they have a cleaner burn. Even so, they still have harmful emissions. This stuff is not nearly as clean as we are being told.

The important thing is that to effect change - Experts may sharpen the point, but you need the hammer of public opinion to drive the nail home. Let's get active and vocal on this. It is OUR health. Our taxes. Our garbage. Let's use the better solution, like Markham is doing. But we have to make our views known to our local politicians.

Contact your Clarington Council including the Mayor.
Contact
Durham Regional Councillors.
Contact your
Durham MPPs.
Let them know how you feel.

10 May 2007

The OTHER side of the story

After attending last night's CAW public infomation session on the "Energy to Waste" (INCINERATION) issue, I left the building with an array of feelings.

First, there was the renewed observation that we were only being given a sanitized version of the facts surrounding energy-from-waste, thermal waste treatment, incineration or whatever you want to call it. It's all the same thing - burning garbage. Burning toxic materials. Emitting cancer causing dioxins, furans, toxic metals - nano-particulates that are so tiny they not only get into your lungs, they cross the membranes into your blood and travel through your body. They also get into our food - dairy products, meat, chicken, fish, fruits, vegetables. No, these are not "zero emission" facilities. They contribute to smog, asthma; the list goes on and on.

We also learned that these trips to Europe are designed for one thing - to pull the wool over the eyes of those being told that this is the same technology and we would have the same "clean" emissions they have over there. Hogwash! What our politicians are not told is that they are not burning the same materials we will be burning here. Their emissions are not the same as those here. And the emissions in the European countries - although cleaner than ours will be - are still dangerous. But going to view the European incinerators yet again and thinking that they can compare apples to oranges is a waste of time and money. North American incinerators would be more worthwhile to view, if they must be viewed.

How about the Brampton facility? It's not nearly so "clean" as we've been led to believe by the consultants. Are all our regional councillors (and chair) willing to go through that facility without masks? Or with the plain paper masks given to the workers? Are they willing to spend a few hours there, in the midst of the toxic dust? It should be a requirement prior to deciding on "thermal treatment" of our waste. A few hours on a *typical* day at the incineration plant. If they are all so convinced it is totally safe, then why not? Not only our regional councillors, but the little excursion should also include Premier McGuinty, who says there are "no emissions" from incinerators and they are so safe that we don't even need a full EA. They can/should now be fast-tracked. Oh yes, and the consultants, who are the same ones used for all the municipalities who have contemplated or are contemplating incineration. They should also be made to spend the day in the Brampton plant sans protection.

I was disgusted by the fact that our own Mayor made the foolish decision to attend a regular monthly meeting of the Museum Board rather than attend this one-time opportunity to hear "the other side of the story" from experts who gave fascinating, factual presentations that I guarantee you, NO ONE slept through! This just shows how important our Mayor considers this issue. His mind is made up and he won't open it to valid information that turns much of the myth we've been fed on it's ear. I've been told he was not only invited to this public forum, but contacted by numerous people who practically begged him to attend. Someone in a comment said they were so angry they could spit. I couldn't agree more. This Mayor obviously has a serious problem with "priorities". This is not the first time he has shown his lack of judgement, and it won't be his last. This is sad for Clarington.

At least Councillors Novak and Trim were present, as they are the other 2/3 of Clarington's representation at the Region. I hope they will give serious thought to what they heard and received as much of an education as the rest of us did last night. I also hope they will take the opportunity to investigate how Markham has gotten to a 70% diversion rate in 2 years - that's a city of 300,000 people! And they are aiming for 75% diversion by next year, and zero waste (or darn close to it) by 2020. Now those are sustainable goals we should all be aspiring to. Did you hear that, Durham Region???? Thank you to Councillors Novak and Trim for taking the time to attend, as well as local Councillor Hooper.

Of the 30% waste left in garbage in Markham now, they found that 27% are items which could be donated, 31% is organics (composting will take care of that), 19% is recyclable paper (shredded paper, etc), and that leaves 17% (of the 30%) as "residual waste". That leaves very little to be disposed of, and those rates can be brought down even more with other such as EPR incentives which I'll get into in future posts.

Suffice it to say that there ARE other alternatives. Durham Region came to a hasty conclusion that Thermal Treatment was the only way to go - the most desirable option in ridding ourselves of waste. They are dead wrong. But have they spent too much and gone too far to back off and consider other options as they have repeatedly been asked by residents to do?

What has happened to "democracy" when we are forced to go in a direction most people don't want to go? Why would they make a decision on a technology and not even consider the other options? Options that would not only be safer and healthier for all of us, but also would be less expensive, would create a lot more jobs, and enable us to be leaders in an industry who's time has come.

I've only touched the surface today, but will continue with much more information in the days to come. We can only hope that our politicians will open their eyes and smell the garbage.

Thank you to CAW Durham Region Environmental Council for arranging this public forum, and especially to Paul Connett, PhD, John Jackson, board member of Waste Diversion Ontario, and Erin Shapiro, Markham Ward Councillor for an outstanding evening of information and education. More on these excellent presentations in future posts.

Anyone who has the opportunity to hear these speakers at any time in the future MUST make the effort to attend and learn. You will not be disappointed.

Thank you also to the Clarington councillors and the 8 Regional Councillors who attended. At least a few of you care enough to continue your education on incineration and other options available to us. It is appreciated by Durham residents. We do notice who is and who is not there. And we won't forget.

Albert Einstein:
"A clever person solves a problem. A genius avoids it."